Commercial Solar for Other Commercial in Irving
A typical commercial solar system for other commercial in Irving can save up to $2,187,676 over 25 years. With 5.0 peak sun hours per day and a commercial electricity rate of approximately $0.102/kWh through Oncor, Irvingis one of Texas's strongest markets for commercial solar.
kWh/m² per day in your area
Avg $/kWh through Oncor
For a typical Irving other commercial
With all federal & state incentives
Why Irving Other Commercial Are Ideal for Solar
Any commercial property can benefit from solar. The system is sized to your specific energy consumption and roof characteristics.
Strong Solar Resource
Irving averages 5.0 peak sun hours per day, ideal for commercial solar production.
Real Utility Rates
With Oncor commercial rates around $0.102/kWh, every solar kWh delivers direct savings.
Tax Advantages
30% Federal ITC + 5-year MACRS depreciation + 100% Texas property tax exemption stack together.
Irving Other Commercial Solar: Local Market Context
Why Irving
Irving's concentration of corporate headquarters—including Fortune 500 companies like ExxonMobil's campus and major operations from Kimberly-Clark and Fluor—means office parks, data centers, and mixed-use commercial properties consume electricity around the clock, making the $8.50/kW demand charge from Oncor a significant monthly expense. With 1510 kWh produced per installed kW annually, a properly sized rooftop array on a 50,000-square-foot other commercial building can offset 30–50% of daytime demand peaks, directly reducing those per-kilowatt penalties that stack up in multi-tenant and flex-industrial spaces.
Industrial Corridors
Other commercial properties are heavily concentrated along the Las Colinas Urban Center—home to office towers, hospitality, and mixed-use developments—as well as the State Highway 161 corridor near DFW Airport, where warehouses double as showrooms and logistics hubs with significant rooftop square footage. The South Irving industrial area near Shady Grove Road also hosts numerous flex-warehouse and light manufacturing facilities that blend office and storage space, ideal candidates for mid-scale 100–300 kW solar installations.
Oncor Specifics
Oncor requires commercial solar systems in deregulated Texas markets to follow the Distributed Generation Interconnection Request process, with projects under 500 kW typically clearing Level 2 review within 20–25 business days if the local circuit has adequate hosting capacity. Because Irving sits in a deregulated market, your retail electricity provider (REP) handles net metering or excess generation credits separately from Oncor's delivery tariff, so demand charge savings from solar production during the 11 a.m.–5 p.m. window are captured on the Oncor delivery side while your REP contract governs energy credit rates.
Sample Cost Breakdown for Irving Other Commercial
Estimates for a typical 310 kW system on a Irving other commercial.
| Cost Item | Amount |
|---|---|
| Gross System Cost | $527,000 |
| Federal ITC (30%) | −$158,100 |
| MACRS Depreciation Tax Savings | −$111,988 |
| Texas Property Tax Exemption (25 years) | −$289,850 |
| Net Effective Cost | $256,913 |